Borough assembly work session May 13 on waterfront master plan
Summary by Wrangell Sentinel
1 Articles
1 Articles
All
Left
Center
1
Right
Borough assembly work session May 13 on waterfront master plan
The borough’s continuing work on its downtown waterfront master plan is ramping up after the community’s nearly 50-year-old freight barge landing was shut down. The assembly will hold a work session on the master plan at 6 p.m. Tuesday, May 13, at City Hall. The barge ramp, next to the City Dock, was closed down in mid-March after an engineering report detailed structural and safety concerns about...
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center1Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage