City to invest $40 million in air quality upgrades at Post Point Wastewater Treatment plant
Summary by City of Bellingham, WA
1 Articles
1 Articles
All
Left
Center
Right
City to invest $40 million in air quality upgrades at Post Point Wastewater Treatment plant
The City of Bellingham is moving forward with a $40 million investment to upgrade the sewage sludge incinerators at the Post Point Wastewater Treatment Plant with enhanced air emission control equipment. This project is vital to meet increasingly stringent air quality regulations and fulfills the City’s commitment to maintain the incinerators’ long-term operation, following a strategic decision in 2022.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage