See the Full Picture.
Published loading...Updated

ENERCON Achieves Milestone with First Kilowatt Hour Fed Into Grid from E-175 EP5 E2 Prototype

Summary by EuropaWire.eu
The prototype of the E-175 EP5 E2 was successfully commissioned. (IN BRIEF) ENERCON has successfully commissioned the E-175 EP5 E2 prototype at the Wachendorf site in Lower Saxony, marking a key milestone in the turbine’s development. The E-175 EP5 E2, with a rated power of 7.0 MW and a rotor diameter of 175 meters, is one of the most powerful onshore turbines in Europe. The new external rotor design increases the generator’s power capabilities.…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

EuropaWire.eu broke the news in on Friday, May 16, 2025.
Sources are mostly out of (0)