ENERCON Achieves Milestone with First Kilowatt Hour Fed Into Grid from E-175 EP5 E2 Prototype
Summary by EuropaWire.eu
1 Articles
1 Articles
All
Left
Center
Right
ENERCON Achieves Milestone with First Kilowatt Hour Fed Into Grid from E-175 EP5 E2 Prototype
The prototype of the E-175 EP5 E2 was successfully commissioned. (IN BRIEF) ENERCON has successfully commissioned the E-175 EP5 E2 prototype at the Wachendorf site in Lower Saxony, marking a key milestone in the turbine’s development. The E-175 EP5 E2, with a rated power of 7.0 MW and a rotor diameter of 175 meters, is one of the most powerful onshore turbines in Europe. The new external rotor design increases the generator’s power capabilities.…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage