Road Work Will Continue At Talmage Mayo Road Through May 23
Summary by The Harrodsburg Herald
1 Articles
1 Articles
All
Left
Center
Right
Road Work Will Continue At Talmage Mayo Road Through May 23
File image. The Kentucky Transportation Cabinet (KYTC) is advising motorists that an extended closure is necessary for a section of Talmage Mayo Road/KY 1160. The temporary closure is necessary for cross drain installation operations to continue. Work was originally scheduled to be completed Friday, May 16. The closure will be in effect between milepoints 6.4 and 8.7 weekdays Monday, May 19 through Friday, May 23 from 8:30 a.m. until 3 p.m. Emer…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage